A dataset provided by the European Space Agency

Name MEX-M-SPI-2-IREDR-RAWXMARS-EXT7
Mission MARS-EXPRESS
URL https://archives.esac.esa.int/psa/ftp//MARS-EXPRESS/SPICAM/MEX-M-SPI-2-IREDR-RAWXMARS-EXT7-V1.0
DOI https://doi.org/10.57780/esa-7zdtnkc
Author European Space Agency
Abstract The Mars Express SPICAM level 0B IR data set contains raw measurements from the infrared SPICAM spectrometer collected during the extension 7 MARS phases
Description MEX EXT 7 SPICAM MARS IR EDR-RAW Data Set Overview ================================================== The EXT 7 SPICAM MARS IR EDR-RAW (level 0B) dataset contains raw measurements from the infrared SPICAM spectrometer collected during the MARS sixth extented phase mission of Mars Express. Data are stored in the MEXSPI_1002/DATA/MARS directory. The MARS directory is then divided into subdirectories labeled (MTPnn_pppp_nnnn) corresponding to the different Mars nominal phases defined by the MARS EXPRESS mission planning system with: MTPnn : Medium Term Planning nnn(nnn=001,002,003...)ppppp,nnnnn: orbit range. The extended mission 7 covers the range starting from MTP191 (i.e 2019 JAN 01, orbit 18976) to MTP216 (i.e 2020 DEC 25, orbit 21464). This dataset includes also the very last part of the 6th extension from 27th of December (orbit 18963 to orbit 19875). An easily viewed version of each record of the MEX EXT 7 SPICAM MARS IR EDR-RAW data set is shown in MEXSPI_1002/BROWSE
Instrument SPICAM
Temporal Coverage 2018-12-27T00:00:00Z/2020-12-24T00:00:00Z
Version V1.0
Mission Description Mission Overview ================ Mars Express was the first flexible mission of the revised long-term ESA Science Programme Horizons 2000 and was launched to the planet Mars from Baikonur (Kazakhstan) on June 2nd 2003. A Soyuz-Fregat launcher injected the Mars Express total mass of about 1200 kg into Mars transfer orbit. Details about the mission launch sequence and profile can be obtained from the Mission Plan (MEX-MMT-RP-0221) and from the Consolidated Report on Mission Analysis (CREMA)(MEX-ESC-RP- 5500). The mission consisted of (i) a 3-axis stabilized orbiter with a fixed high-gain antenna and body-mounted instruments, and (ii) a lander named BEAGLE-2, and was dedicated to the orbital and in-situ study of the interior, subsurface, surface and atmosphere of the planet. After ejection of a small lander on 18 December 2003 and Mars orbit insertion (MOI) on 25 December 2003, the orbiter experiments began the acquisition of scientific data from Mars and its environment in a polar elliptical orbit. The nominal mission lifetime for the orbiter was 687 days following Mars orbit insertion, starting after a 5 months cruise. The nominal science phase was extended (tbc) for another Martian year in order to complement earlier observations and allow data relay communications for various potential Mars landers up to 2008, provided that the spacecraft resources permit it. The Mars Express spacecraft represented the core of the mission, being scientifically justified on its own by investigations such as high- resolution imaging and mineralogical mapping of the surface, radar sounding of the subsurface structure down to the permafrost, precise determination of the atmospheric circulation and composition, and study of the interaction of the atmosphere with the interplanetary medium. The broad scientific objectives of the orbiter payload are briefly listed thereafter and are given more extensively in the experiment publications contained in ESAs Special Publication Series. See NEUKUM&JAUMANN2004, BIBRINGETAL2004, PICARDIETAL2004, FORMISANOETAL2004, BERTAUXETAL2004, PAETZOLDETAL2004 and PULLANETAL2004. The Mars Express lander Beagle-2 was ejected towards the Mars surface on 19 December 2003, six days before the orbiters capture manoeuvre. The probe mass was limited to about 70 kg by the mission constraints, which led to a landed mass of 32 kg. The complete experimental package was weighed in approximately at 9kg. The landers highly integrated scientific payload was supposed to focus on finding whether there is convincing evidence for past life on Mars or assessing if the conditions were ever suitable. Following safe landing on Mars, this lander mission would have conducted dedicated studies of the geology, mineralogy, geochemistry, meteorology and exobiology of the immediate landing site located in Isidis Planitia (90.74?E, 11.6?N), as well as studies of the chemistry of the Martian atmosphere. Surface operations were planned to last about 180 sols or Martian days ( about 6 months on Earth), see SIMSETAL1999. As no communication could be established to the BEAGLE-2 lander, it was considered lost in February 2004 after an extensive search. A nominal launch of Mars Express allowed the modify the orbit to a G3-ubeq100 orbit. The G3-ubeq100 orbit is an elliptical orbit, starting with the sub-spacecraft point at pericentre at the equator and a sun ^ation of 60 degrees. At the beginning of the mission, the pericentre moves southward with a shift of 0.54 degree per day. At the same time the pericentre steps towards the terminator which will be reached after about 4 months, giving the optical instruments optimal observing conditions during this initial period. Throughout this initial phase lasting until mid- May 2004, the downlink rate will decrease from 114 kbit/s to 38 kbit/s. After an orbit change manoeuvre on 06 May 2004 the pericentre latitude motion is increased to guarantee a 50/50 balance between dayside and nightside operations. With this manoeuvre, the apocentre altitude is lowered from 14887 km to 13448 km, the orbital period lowered from ~7.6 hours to 6.645 hours, and the pericentre latitude drift slightly increased to 0.64 degree per day. After 150 days, at the beginning of June 2004, the South pole region was reached with the pericentre already behind the terminator. Following, the pericentre moves northward with the Sun ^ation increasing. Thus, the optical instruments covered the Northern Mars hemisphere under good illumination conditions from mid-September 2004 to March 2005. During the next mission phase, lasting until July 2005, the pericentre was again in the dark. It covered the North polar region and moves southward. Finally, throughout the last 4 months of the nominal mission, the pericentre was back to daylight and moves from the equator to the South pole, and the downlink rate reached its highest rate of 228 kbit/s. The osculating orbit elements for the eq100 orbit are listed below: Epoch 2004:1:13 - 15:56:0.096 Pericentre (rel. sphere of 3397.2 km) 279.29 km Apocentre (rel. sphere) 11634.48 km Semimajor axis 9354.09 km Eccentricity 0.60696 Inclination 86.583 Right ascension of ascending node 228.774 Argument of pericentre 357.981 True anomaly -0.001 Mission Phases ============== The mission phases are defined as: (i) Pre-launch, Launch and Early Operations activities, including (1) science observation planning; (2) payload assembly, integration and testing; (3) payload data processing software design, development and testing; (4) payload calibration; (5) data archive definition and planning; (6) launch campaign. (ii) Near-Earth verification (EV) phase, including (1) commissioning of the orbiter spacecraft; (2) verification of the payload status; (3) early commissioning of payload. (iii) Interplanetary cruise (IC) phase (1) payload checkouts (2) trajectory corrections (iv) Mars arrival and orbit insertion (MOI) (1) Mars arrival preparation; (2) lander ejection; (3) orbit insertion; (4) operational orbit reached and declared; (5) no payload activities. (v) Mars commissioning phase (1) final instrument commissioning, (2) first science results, (3) change of orbital plane. (vi) Routine phase; Opportunities for dawn/dusk observations, mostly spectroscopy and photometry. This phase continued into a low data rate phase (night time; favorable for radar and spectrometers). Then daylight time, and went into a higher data rate period (medium illumination, zenith, then decreasing illumination conditions). Observational conditions were most favorable for the optical imaging instruments at the end of the routine phase, when both data downlink rate and Sun ^ation are high. (vii) MARSIS Deployment The dates of the MARSIS antenna deployment is not known as of writing this catalogue file. (viii) Extended operations phase A mission extension will be proposed in early 2005 to the Science Programme Committee (SPC). (ix) Post-mission phase (final data archival). Science Subphases ================= For the purpose of structuring further the payload operations planning, the mission phases are further divided into science subphases. The science subphases are defined according to operational restrictions, the main operational restrictions being the downlink rate and the Sun ^ation. The Mars Commissioning Phase and the Mars Routine Phase are therefore divided into a number of science subphases using various combinations of Sun ^ations and available downlink bit rates. The discrete downlink rates available throughout the nominal mission are: - 28 kbits/seconds - 38 kbits/seconds - 45 kbits/seconds - 57 kbits/seconds - 76 kbits/seconds - 91 kbits/seconds - 114 kbits/seconds - 152 kbits/seconds - 182 kbits/seconds - 228 kbits/seconds The adopted Sun ^ation coding convention is as follows: - HSE for High Sun Elevation (> 60 degrees) - MSE for Medium Sun Elevation (between 20 and 60 degrees) - LSE for Low Sun Elevation (between -15 and 20 degrees) - NSE for Negative Sun Elevation (< -15 degrees) The science subphase naming convention is as follows: - Science Phase - Sun Elevation Code - Downlink Rate - Science Subphase Repetition Number The following tables gives the available Science Subphases: NAME START END ORBITS BIT SUN RATE ELE ---------------------------------------------------------- MC Phase 0 2003-12-30 - 2004-01-13 1 - 16 MC Phase 1 2004-01-13 - 2004-01-28 17 - 58 114 59 MC Phase 2 2004-01-28 - 2004-02-12 59 - 105 91 69 MC Phase 3 2004-02-12 - 2004-03-15 106 - 208 76 71 MC Phase 4 2004-03-15 - 2004-04-06 209 - 278 57 51 MC Phase 5 2004-04-06 - 2004-04-20 279 - 320 45 33 MC Phase 6 2004-04-20 - 2004-06-04 321 - 475 38 22 MR Phase 1 2004-06-05 - 2004-08-16 476 - 733 28 -13 MR Phase 2 2004-08-16 - 2004-10-16 734 - 951 28 -26 MR Phase 3 2004-10-16 - 2005-01-07 952 - 1250 28 16 MR Phase 4 2004-01-08 - 2005-03-05 1251 - 1454 45 63 MR Phase 5 2004-03-05 - 2005-03-24 1455 - 1522 76 16 MR Phase 6 2004-03-25 - 2005-07-15 1523 - 1915 91 0 The data rate is given in kbit per seconds and represents the minimal data rate during the subphase. The sun ^ation is given in degrees and represents the rate at the beginning of the subphase. Detailed information on the science subphases can be found in MEX-EST-PL-13128.
Creator Contact Franck Montmessin
Date Published 2019-08-22T00:00:00Z
Publisher And Registrant European Space Agency
Credit Guidelines European Space Agency, Franck Montmessin, 2019, 'MEX-M-SPI-2-IREDR-RAWXMARS-EXT7', V1.0, European Space Agency, https://doi.org/10.57780/esa-7zdtnkc